111, glass or mirrors and other things that are not easy to carry are best to buy nearby, or think about transportation methods first.

112, curtains are best made after the furniture appliances are fully entered, to match the overall style of color. But the track can be installed before cleaning.

113. Gas conversion is best done before tiling, otherwise it may damage the wall. It is best to have the gas company draw a picture or mark it on the wall, because the cabinet company needs to open a hole in the cabinet as required.

114, the cabinet installation time is longer, from 4 to 5 hours, and more than 2 days, to be mentally prepared. During installation, check that the material used is the one you ordered (the cabinet material can be seen through the hinge hole). Clean the kitchen before installing the cabinet, because once the cabinet is installed, those dead corners can no longer be cleaned.

115, furniture installation is best to look at the side, especially like the wardrobe layer is a few holes to choose, I did not look at it, the result of the distance between the layers is too small, hanging clothes stretch Do not open, but also adjust later.

116. Considering the pollution of formaldehyde to the environment, green plants such as spider stalks can be placed in the house, and the cabinet doors of the furniture are all open to emit odors, and it is also possible to buy things that specifically eliminate odors.

117. Install a gas alarm and reserve gas ignition.

118. Time for brushing wood paint: It is best to wait until the room has been finished with floor tiles or wooden floors. If you must brush, it is best to clean the room. In the room without floor tiles or wooden floors, there is a lot of dust in the room. When the wood is painted, the dust is easy to adhere to the surface of the woodwork brushed with wood lacquer, and it feels like a thorn. The sandpaper of the label is polished and then brushed again, but the final feel and the overall effect of the brush will be buckled. After the floor tiles are finished, the dust content in the air is much less than that before the paving. Basically, the dust does not adhere to the surface of the wood products after brushing the wood paint. The reason why this is said is because Xiao Wu’s decoration encountered this situation. I originally saw the effect of brushing it before I decided to buy it. It feels very smooth and feels like my home decoration. Like the wooden door. It is only because of the above situation that the results have been discounted. This has always been Xiao Wu’s regret. Moreover, during the process of organizing the lacquer group purchase, I also had this situation in my classmates. So here to remind everyone to pay attention. I don't know if there are other cases of wood lacquer, but according to the principle of the same principle, I would like to remind everyone to pay attention here.

119, on the touch up paint: the painter pays to wait for the wall to dry and then finish the putty, the putty layer is dry and painted. After brushing the paint, if there is no reason, it is necessary to install the lamps and various electrical switches. Please ask the students to pay attention to the installation of lamps and electrical switches, the handcuffs will be cleaned before loading, so that it will not stain the wall when installed. It also saves a process of refinishing. Of course, the wall is smeared, the decoration team must let the painter pay for the paint, that is, clean the stained wall (if it is a paint company, they will also let the teacher pay for the paint, If you pay attention to a lot of painters paying a part of the paint after brushing the wall, the remaining part of the paint is used to make up the paint). Just pay attention, don't let the teacher who installed the lamp pay to smudge the wall, so that the painter can pay less (at least half a day), we are also convenient for ourselves, why not? Sometimes, it is convenient and convenient. In general, the wood paint is brushed before the wall paint is applied. This is to prevent the wood paint from affecting the wall surface of the paint wall during the drying process. Of course, in the actual operation process, you can also brush the wood lacquer after the floor tiles are laid out (the plaster on the wall has been approved before the floor tiles), and then the wall paint is dried after the wood lacquer is dry, just do it. Will affect the construction period. If you are afraid of affecting the construction period, and you want to minimize the impact of dust in the air, then you should clean up the hygiene in the room.

120, the choice of the decoration team: As for the first choice of guerrillas or formal companies, I think it is not important, the key is to give your construction team the head is serious and responsible, the technology of the renovated workers, of course, the quality and price of the decoration.
First of all, don't look for more than four decoration companies. For most of them, if your time is very rich, then it is another matter. Before talking with the decoration company, be sure to know which renovation project you want to do. You can ask the decoration company to report all the projects first. Compare the price and comprehensive consideration of various factors before you decide which items to outsource. Which items should be done by the decoration company.
For the decoration, the lower the quotation of the decoration, the better. Of course, the decoration company's opinion is the opposite. Sometimes, in order to pull the business, the decoration company will press some quotations relatively low, so that the quality of the project and the quality of the materials are more difficult to guarantee. There are so many renovations, and you want the items to be the lowest price, which is unrealistic. And the quotation in the decoration can not only look at the number, but also depends on the content inside, the materials, specifications, brands and so on used in this project. You must know that every quotation in the decoration is actually very particular.

121, construction? Since I am not in a hurry to check in, I plan to find a casual worker: the good craftsmen invited by the neighbors may become the objects of my search: a mason, a woodworker, a plumber, a painter. Step by step design step by step, I believe that slow work out of fine work.

122. Use every penny on the blade: When you look at the decoration materials, you will definitely look at it. The good things are too many, and it seems that every single one seems to be economically affordable. These things can be purchased in one place in a short period of time, and the economic pressure is really great. Often most people are in a mess at this time. The result is that the final budget is overspending, and the second is that the price of the first thing bought is excellent, and the things bought later are uneven.
My opinion is:
First, set the price first, then select the material.
Do not waste time on material items that exceed the 10% mark at the predetermined price. Merchants are always better than buyers. I am working on a detailed plan of the required materials, which will be posted for future reference in future posts.
Second, the province can be saved, the flower will be spent.
The most expensive place is woodworking, kitchen cabinets.
The most prone to quality problems are hydropower renovation, kitchen and bathroom waterproofing.

123. The cost of making furniture must be higher than buying furniture. General furniture is 500-700 yuan per square meter.

124. Concealed works are the most important places that cannot save money: such as water circuit renovation and waterproof treatment.
The method is to ask B&Q to do it. B&Q now has a single decoration service: such as hydropower transformation, materials purchased, waterway 40 yuan per meter, circuit 20 yuan per meter, with half-year warranty. There is a detailed single service project and quotation announcement on the east side of the first floor of B&Q. You can make a reference.

125. The most worry-free way is to use the resources on the Internet to collect, retain, organize and integrate, and will definitely come in handy in the future.

126. In order to save time and improve efficiency, every time the decoration materials market has gained, a detailed and practical procurement and budget plan is very important.
It is easier to implement the plan list when purchasing by room. Every time you go to the street to see things in the same room, it is easy to compare and synthesize, and it is easy to be effective.
First, the entrance hall project 2, the living room project 3, the restaurant project 4, the master bedroom project 5, the children's room project 6, the study project 7, the main guard project 8, the guest project 9, the kitchen project ten, the balcony project eleven, the Yintai project I will post the plan sample list I listed below for reference: the data in the table is an example.
This list is more convenient for purchasing plans. Before the construction, the corresponding items can be reclassified and classified according to the types of work, and divided into masonry, woodworking, hydropower, paint, etc. You can also add the “Construction Requirements” column to the right side of the table. Such as (three batches of three layers of latex paint on the wall; Weiye board for shoe cabinets, brush polyurethane varnish) and so on.

127, the rear speakers of the home theater, the sound wire should be buried in the living room, this is very important!

128. Add a sink to the balcony, and pre-embed the water pipe for decoration. The balcony sink is very important, watering flowers, washing hands, etc.

129, the bathroom, the kitchen needs background music, pre-embedded audio and audio wires.

130. There must be sockets on both sides of the balcony. When the Chinese New Year is hanging lanterns, it is energized.

1: The bathroom is divided into dry and wet zone 2 floor drain is better placed in the wet zone
2: If it is a natural gas-fired water heater, pay attention to the bathroom to have adequate ventilation.
3-4: If you don't understand, you can ask a professional friend to accompany the current deceived master.
11: Hydropower is still looking for professionals to help themselves. Because in this respect, I also know the designer's own life needs to carry out the transformation. However, once the problem arises during the transformation and migration, the problem is solved when your home is installed. It is a very big thing to remove the wall and re-do it.
12: The waterproof of the bathroom depends on the floor tile that you choose. The professional bathroom floor tiles are waterproof. You can rest assured when you buy it. But the reason why the waterproof is not good is the design problem. If you don’t go to the designer, he will cut the bricks to fill your floor. This will destroy the original design of the waterproof tiles. Of course, such tiles can be used. You can’t find out in the early days, but your house. We live for decades and we need a long-term guarantee, so be sure to pay attention to the design of your bricks when it is paved. 19 The combination cabinets are now ready to buy directly because the water problems in the home need to be designed. The designer will personally design the design, of course, in addition to the waterway design, it is necessary to determine the designer who owns the home and who often goes to the kitchen. This is a better way to determine the size of the cabinet so that you can use it more comfortably when cooking at home. Large, safe and reliable tile grouts are not the same as white cement, but tilers usually fill the porcelain with white cement. Brick grout, so that the caulking agent can't keep up, the caulk should be a little bit of a joint rather than dry to the wall paste. Also, the hinges of the cabinets, the sinking of the pool, the switches, etc. should be used well, and the cabinet fabric, the pool body, and the bolts can be used in general, of course, if you have money, you will not care. If it is not a big bag, it is recommended to buy building materials as far as possible to go to the Oriental home, actually home, B&Q and other places to return.

Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }